Contango starts a 40,000-meter Kitsault Valley drill program in 2026, with three rigs active and two more planned. Primary targets include Dolly Varden (Torbrit, North Star), Wolf, and Homestake Ridge, with a resource update and a preliminary economic study due H1 2027. A notable drill intercept at Wolf (DV25-470) shows 518 g/t Ag over 0.52 m, highlighting high-grade potential.
The drill program advances resource growth and a 2027 IA study, signaling potential re-rating if results prove economic, aided by high-grade Wolf intercepts.
Bullish CTGO on 2027 IA study progress; catalysts in next 12 months.
Industry News; CTGO updates on a multi-deposit drill program with near-term catalysts and potential transition toward development.