VIZSLA SILVER DELIVERS POSITIVE FEASIBILITY STUDY FOR THE PANUCO PROJECT
1. Vizsla's Panuco project shows high potential with an After-Tax NPV of $1.8 billion. 2. Feasibility study estimates production of 17.4 million oz AgEq annually. 3. The project requires $173 million in initial costs with a 7-month payback. 4. Panuco project set for production in late 2027 after required approvals. 5. Study indicates an IRR of 111%, indicating strong economic viability.