ARIS MINING ANNOUNCES POSITIVE PREFEASIBILITY STUDY RESULTS FOR THE SOTO NORTE GOLD PROJECT IN COLOMBIA
1. Aris Mining's Soto Norte project shows robust economics and environmental features. 2. The prefactual study reveals a reduced processing capacity of 3,500 tpd. 3. Projected gold production estimates average 263 koz annually for years 2-10. 4. Initial capital is $625 million, with an IRR of 35.4% and a 2.3-year payback. 5. The project aims to engage local communities and ensure sustainable operations.