/C O R R E C T I O N from Source -- i-80 Gold Corp/
1. IAUX updates its 2025 PEA for the Cove Project in Nevada. It validates a regional hub-and-spoke mining strategy. 2. The study shows an 8‑year mine life with ~100k oz annual gold production. Cash costs are estimated at ~$1,194/oz. 3. Revised resource estimates are 311k oz indicated (8.2 g/t) and 1.16 Moz inferred (8.9 g/t). 4. At a $2,175/oz gold price, the project yields an after‑tax NPV of $271M and a 30% IRR. Permitting is expected by end‑2027.