Cipher Mining Commences Bitcoin Mining at Black Pearl Data Center
1. Cipher Mining successfully energized 300 MW at Black Pearl site. 2. Total hashrate expected to increase to ~23.1 EH/s by Q3 2025. 3. Phase I's hashrate will reach ~9.6 EH/s with new mining rigs. 4. Cipher aims to remain a low-cost producer in bitcoin mining. 5. The company has a 2.6 GW pipeline for HPC and mining.