IsoEnergy and Purepoint Extend High-Grade Mineralization at the Dorado JV with a 70 Metre Step-Out Peaking at 110,800 CPS
1. IsoEnergy reports significant drill results from the Dorado project. 2. Drill hole PG25-07A shows high uranium radioactivity. 3. The Nova Discovery mineralization continues northeast, indicating potential expansion. 4. Drilling at Q48 and Turaco will resume in winter for further exploration. 5. IsoEnergy plans a 5,400-metre drill program to explore high-priority targets.