KBR Selected to Deliver Detailed Engineering Design for the Gas Growth Integrated Project Operated by TotalEnergies in Iraq
1. KBR awarded detailed design services for Iraq's AGUP2 project by ENKA. 2. The project will boost oil production capacity to 210,000 barrels per day. 3. KBR's long-standing relationship with TotalEnergies strengthens its market position. 4. The project supports Iraq's goal for sustainable energy and reduced emissions. 5. KBR's expertise in energy transitions positions it well for future projects.