McEwen Mining: 2024 Production Within Guidance; 2025 Guidance: Stable Production and Cost/Oz
1. McEwen Mining's 2024 production met expectations with 135,900 GEOs. 2. Fox Complex production was below guidance due to stope failure. 3. 2025 guidance projects lower production driven by operational transitions. 4. Investment in waste stripping expected to improve future production. 5. Company faces various operational risks impacting future forecasts.