Power Metallic to Increase From 3 to 6 Drill Rigs at the Nisk Project
1. Power Metallic raised over C$40 million for exploration through 2026. 2. Company plans 100,000 metres of drilling in Lion, Tiger, and Nisk zones. 3. Expansion of core logging facility will enable six drill rigs from June. 4. Recent BHEM surveys have led to new sulphide intersections in key zones. 5. Assay results pending for multiple drill holes, indicating potential resource expansion.