Soluna Fills Rack Capacity at Dorothy 2 with 30 MW Expansion with Top-Tier Bitcoin Miner
1. Soluna announces a 30 MW expansion at Project Dorothy 2. 2. This expansion fully contracts the project's hosting capacity. 3. The project represents 1,462.03 PH/s powered by renewable energy. 4. Expansion reflects increasing demand for sustainable infrastructure in Bitcoin mining. 5. Project Dorothy 2 aims to reach full capacity by Q4 2025.