U.S. GoldMining Inc. Commences Metallurgical Testwork At Whistler Gold-Copper Project, Alaska
1. USGO has begun metallurgical testwork for the Whistler Project. 2. The goal is to optimize metal recovery processes. 3. Previous tests indicated recoveries of 70% for gold and 83% for copper. 4. BaseMet will conduct the testwork using drill core samples. 5. The results will inform a preliminary economic assessment (PEA).