California American Water has started first-time production at ASR Well 4 on the Monterey Peninsula and put a dedicated mercury treatment facility into service, adding up to 1,400 gpm of groundwater production with downstream samples showing zero mercury detections.
West Virginia American Water is building an 816,000-gallon water storage tank on Oak Lee Drive in Ranson; construction is underway and expected to continue through end-2026.
West Virginia American Water has begun site-preparation work for a new Central Grove Water Treatment Plant that will join and connect local water systems to increase operational flexibility.