GridStor Announces Acquisition of Texas Battery Energy Storage Project From Balanced Rock Power
1. GridStor acquires a 150 MW battery project in Texas from Balanced Rock Power. 2. Texas anticipates a 50% rise in peak load demand by 2030. 3. The project will create over 100 jobs during construction, aiding local economies. 4. Goldman Sachs Asset Management backs GridStor, enhancing their infrastructure capabilities. 5. ERCOT has deployed over 8 GW of battery storage, indicating growing market demand.